profess zhang bingzhang profess xie hongming guangzhou university equipment management engineering consulting co., ltd. were invited to our company during aug.14 to aug.16 f the second phase of tnpm equipment management system project promotion, which mainly focuses on inspection of production area summary of arranged wk in the first phase. great improvements have been made in every wkshop.?through the inspection, the professs the promotion team all considered that there was a gap in the speed of action between the wkshops of west facty those of east facty. particularly, the hydraulic hose wkshop the winding hose wkshop have been in the fefront of the setting management of tools tooling, bringing a good start to other wkshops, which gets good comments consultant professs company leaders.
?
after summarizing the previous wk, the consultant professs put fward the next improvement plan. this plan is carried out in nine aspects, including office area management improvement, tool rules improvement in production area, mould rules improvement in production area, spadic improvement in production area, benchmarking machine platfm improvement, lubrication management improvement, warehouse management improvement, equipment mark management improvement maintenance room management improvement.
??
at the same time, f the initial introduction of the six headstreams, the company arranged trainings in group, mobilized employees to look up the six headstreams register them. each department can solve the problems by itself rept the promotion team office that can not be solved. thereafter, another training course f the statistical analysis of six headstreams was conducted.
?
we will keep moving fward on the road to our ideals. looking back, we have sties along the way; looking up, we have a clear goal; on the road, we are taking firm steps. lets run on the road of promoting the management system of tnpm!